Page 3 of 3 FirstFirst 123
Results 21 to 23 of 23

Thread: Using long leaders (how to reel them?)

  1. #21
    Senior Member King_Me's Avatar
    Join Date
    Jun 2011
    Location
    Delray Beach, FL
    Posts
    2,772
    Quote Originally Posted by Fi$h2nguyen View Post
    Cool, easy to do. But help me understand when this would be used over a uni to uni (what I use now for basically everything and hasn't failed me yet). Is this spider to bristol stronger because you have the double line? With this knot in the video, there will be two separate knots passing through your guides, potentially reducing casting distance whereas uni to uni only has one combined knot. Just trying to get an idea when I may want to use this new knot.
    The double line is used to increase knot strength and serve as a stronger leader. I only use it for lines 12 lbs or greater otherwise I use the uni to uni.

    You can use the Bimini twist knot too for the double line but what a pain to tie!!!

    The knots aren't really that bad going through the guides unless your using rods with small guides.
    "Learn from yesterday, live for today, hope for tomorrow" -Albert Einstein

  2. #22
    Moderator Fi$h2nguyen's Avatar
    Join Date
    Oct 2011
    Location
    Stuart, Fl
    Posts
    3,499
    Quote Originally Posted by King_Me View Post
    The double line is used to increase knot strength and serve as a stronger leader. I only use it for lines 12 lbs or greater otherwise I use the uni to uni.

    You can use the Bimini twist knot too for the double line but what a pain to tie!!!

    The knots aren't really that bad going through the guides unless your using rods with small guides.
    Thanks.

    Bimini's are painful on a rocking boat, but that spider hitch for double line was pretty easy.
    2013 SE Bash & Tournament 5/17-18:
    http://forums.floridasportsman.com/s...es-and-Updates


  3. #23
    Senior Member HogTide's Avatar
    Join Date
    Jun 2011
    Posts
    144
    If you're just talking about paddle trolling then use a rubberband or a small peice of rigging copper wire and attach it to your knot.
    Juzt wrap the wire a few times around the leader once you attach the weight.
    Once you get a decent hit the weight should break away.

    34' Mirage T-250 Yami's...
    23' Famous Craft 250 Zuki...
    __________________________________________________ ____________________________________
    When I'm not Fishing...I'm Catching

Page 3 of 3 FirstFirst 123

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •